Assessing ferrous pipe walls provides critical data to determine the condition and integrity of pipelines. When a utility needed to assess a section of a 20 inch cast iron main that runs under a railroad right-of-way, Broadband Electromagnetic Probe (BEM) accurately assessed the condition and the degree of corrosion or graphitization.
LEAK REPAIR TECHNOLOGY FOR BRIDGE PIPELINES
NASTT (Spring 2023)
Turnkey Alliance Manages Leak-Prone Infrastructure
PPM and Hallen Construction, National Grid’s primary contractor, deliver turnkey and cost effective solutions to line a 24-inch cast iron gas main on a complex project in Queens, New York. The Starline CIPL technology is integral to National Grid’s long-term strategy to manage leaking infrastructure.
LINING A GEOMETRICALLY COMPLEX MESS INVOLVING A LEAKING GAS MAIN
SUPPORTING OPERATORS AS THEY IMPLEMENT THE 2020 PIPES ACT
NASTT (November 2022)
Twenty Years Pioneering Pipeline Technology
TGIA (Spring 2022)
PHMSA 2020 PIPES ACT - SOLUTIONS
The PHMSA Pipes ACT 2020 ”Protecting our Infrastructure of Pipelines and Enhancing Safety (PIPES Act) of 2020” focuses on eliminating hazardous leaks and emissions reduction with requirements applicable to operators of regulated pipeline facilities.
