After a previously installed liner failed, UV CIPP proved an ideal solution to rehabilitate a leaking 36-inch storm drain under a heavily trafficked road at a manufacturing facility in New Jersey.
Eversource Engineers analyze PPM’s CIPL for a capstone project to rehabilitate a leaking bridge pipeline. Read about the role of trenchless technologies in Eversource’s portfolio of solutions for improving safety, reliability, repairing leaks and reducing fugitive emissions.
Steel gas mains come in a variety of specifics requiring a slightly different approach for reconditioning. A heightened level of awareness needs to be addressed in these three areas before the lining process begins.
Assessing ferrous pipe walls provides critical data to determine the condition and integrity of pipelines. When a utility needed to assess a section of a 20 inch cast iron main that runs under a railroad right-of-way, Broadband Electromagnetic Probe (BEM) accurately assessed the condition and the degree of corrosion or graphitization.