Replace broken or cracked water/ sewer lines with UV CURED SAERTEX-LINER® system

UV CIPP lining is proven to be stronger and longer lasting compared to felt lining or fold & form liners

UV Light Source is Inserted into the Pipe for Fast Curing 

  • Rehabilitate pipelines of any material and shape from 8“ to 48”
  • Longer life = Longer Asset Depreciation
  • Higher strength than felt liners and fold & form
  • Greater strength and thinner wall thickness than the original pipeline
  • Minimizes outage time with the ultra-violet (UV) fast curing process
  • Cost efficient compared to current felt-based lining systems available
  • Thinner wall profile and uniform wall thickness
  • SAERTEX-LINER® can be cured by both steam or UV light
  • Up to 90% less fuel consumed  

UV CIPP Trenchless Pipeline Renewal


four hours.

PPM’s water & sewer experts select SAERTEX-LINERS® over other lining methods for both the superior performance, long life and fast curing process.  In most cases, it takes just four hours to install a liner and put the renovated sewer system back into service. And the entire process is electronically controlled, supervised and documented for you.